CNC Lathe Bishop

1st Year

A CNC turning workshop project demonstrating engineering drawing, 3D modelling, machining operations and CNC programming.

Study the drawing first, explore the interactive 3D model, understand the machining operations, examine the CNC program and watch the machining demonstration.

Engineering Drawing

Engineering drawing of Lathe Bishop

3D Model

CNC Machining Operations

The Lathe Bishop is manufactured through a sequence of turning operations. The operations below give an overview of the machining process.

  1. 01. Stopper / Workpiece positioning

    Tool: T4 D1 — Sleeve (Stopper)
    Workpiece positioning / stopper setting

  2. 02. Facing

    Tool: T1 D1 — PCLNR 2020 K12
    Constant RPM: G97 S1500 M03
    Facing passes at Z0
    Feed: F0.05

  3. 03. Contouring / Profile Turning

    Tool: T7 D1 — MVJNR 2020 K16
    Constant surface speed: G96 S200 LIMS=1500
    Spindle CW: M03
    CYCLE95 stock-removal cycle
    The contour is defined using AB:BC

  4. 04. Parting / Cut-off

    Tool: T3 D1 — CFIR 2020 K06
    Constant RPM: G97 M03 S600
    Feed: F0.1
    Uses R1 variable and IF/GOTO loop for the parting sequence

CNC Turning Program

The CNC program contains the tool movements, cutting operations and machining instructions required to manufacture the Lathe Bishop.

N10
G75 X0 Z0
T4D1
G00 X0 Z0
M00
G75 X0 Z0
M01

N20
G75 X0 Z0
T1D1
G97 S1500 M03
M08
G00 X28 Z2
G01 X28 Z0 F0.05
G01 X-1 Z0
G00 X28 Z2
G75 X0 Z0
M01

N30
G75 X0 Z0
T7D1
G96 S200 LIMS=1500 M03
M08
G00 X28 Z2
CYCLE95( "AB:BC", 1.00000, 0.20000, 0.40000, 0.00000, 0.10000, 0.10000, 0.05000, 9, , ,)
G00 X28 Z2
G75 X0 Z0
M05
M09
M01

N40
G75 X0 Z0
T3D1
G97 S600 M03
M08
G00 X28 Z2
G00 X28 Z-54
R1=20
N1005
G01 X=R1 Z-54 F=0.1
G01 X=R1+0.5 Z-54
R1=R1-0.5
IF R1>=-1 GOTO N1005
IF R1<-1 GOTO N1006
N1006
G00 X28 Z-54
G00 X28 Z2
G75 X0 Z0
M09
M05
M30


AB:
G01 X0 Z0
G03 X3 Z-3.325 CR=2
G02 X8 Z-10 CR=10.324
G03 X10.724 Z-20.666 CR=10.324
G02 X12.160 Z-21.819 CR=.8
G01 X14.075 Z-21.819
G01 X16.158 Z-22.693
G03 X16.158 Z-23.306 CR=.4
G01 X8 Z-26.729
G02 X18 Z-42 CR=15.848
G03 X18 Z-45 CR=2
G01 X20 Z-46
G01 X20 Z-54
G01 X26 Z-54
BC:

Resources